Clean pulping
Pulping routes designed for straw, with attention to chemical and water use.
Clean pulping, enzymatic processing and three-component fractionation form the technology directions connecting agricultural residues to material applications.
Company-provided campus aerial renderingHeadquarters & campus
View the company-provided headquarters and campus renderings, with their spatial-layout and brand notes.
We show the confirmed technology directions. Process parameters, equipment configuration, capacity and patent data wait for company verification before publication.
Clean pulping
Pulping routes designed for straw, with attention to chemical and water use.
Enzymatic processing
Enzymes act on cellulose and hemicellulose, linking the fiber and sugar pathways.
Three-component fractionation
Cellulose, hemicellulose and lignin each directed to their best material use.
In-house molds & lines
First-Pak’s molding experience gives materials a place for downstream trials.
This is a working diagram of material routes—not a process-parameter specification. Actual conditions vary by feedstock, grade and end use, and follow production practice and technical files.
Feedstock collection
Wheat straw, rice straw and other agricultural residues enter a manageable feedstock route.
Clean pulping
Pulping routes for straw, with attention to chemical and water use.
Enzymatic processing
Enzymes act on cellulose and hemicellulose, connecting fiber and sugar routes.
Three-component fractionation
Cellulose, hemicellulose and lignin are directed toward suitable material uses.
Materials & validation
Jiecui materials move into customer validation; First-Pak contributes downstream trial experience.
This diagram illustrates material pathways; it does not represent equipment, reaction conditions, yields, capacity or product-performance specifications.
Jiangsu and Guangxi are identified as directions in the group’s production-base layout. Site status, address, commissioning, capacity and product scope await verifiable company evidence.
Current or planned role, product scope and operating status pending company confirmation.
Pending company confirmationConstruction and commissioning progress, product scope and operating status pending company confirmation.
Pending company confirmationManagement systems, product testing, customer validation and IP should be shown separately. Until formal documents are available, none is presented as an established fact.
System certification, applicability and certificate status to be supplied by the company.
Certificate pendingMaterial and article reports are confirmed by market and product scope.
Test report pendingGranted, pending or technical achievement lists await company verification.
To be verified by companyNo certificate, no badge · No source, no number
Material data, process boundaries and deliverable documents will be updated one item at a time as company verification is completed.