Clean pulping
Pulping routes designed for straw, with attention to chemical and water use.
このページの日本語版はレビュー中のため、英語版を表示しています。
Clean pulping, enzymatic processing and three-component fractionation form the technology directions connecting agricultural residues to material applications.
企業提供・工場敷地鳥瞰イメージ本社と工場敷地
企業提供の本社・工場敷地イメージと、空間構成およびブランドに関する注記をご覧いただけます。
We show the confirmed technology directions. Process parameters, equipment configuration, capacity and patent data wait for company verification before publication.
Clean pulping
Pulping routes designed for straw, with attention to chemical and water use.
Enzymatic processing
Enzymes act on cellulose and hemicellulose, linking the fiber and sugar pathways.
Three-component fractionation
Cellulose, hemicellulose and lignin each directed to their best material use.
In-house molds & lines
First-Pak’s molding experience gives materials a place for downstream trials.
This is a working diagram of material routes—not a process-parameter specification. Actual conditions vary by feedstock, grade and end use, and follow production practice and technical files.
Feedstock collection
Wheat straw, rice straw and other agricultural residues enter a manageable feedstock route.
Clean pulping
Pulping routes for straw, with attention to chemical and water use.
Enzymatic processing
Enzymes act on cellulose and hemicellulose, connecting fiber and sugar routes.
Three-component fractionation
Cellulose, hemicellulose and lignin are directed toward suitable material uses.
Materials & validation
Jiecui materials move into customer validation; First-Pak contributes downstream trial experience.
This diagram illustrates material pathways; it does not represent equipment, reaction conditions, yields, capacity or product-performance specifications.
Jiangsu and Guangxi are identified as directions in the group’s production-base layout. Site status, address, commissioning, capacity and product scope await verifiable company evidence.
Current or planned role, product scope and operating status pending company confirmation.
企業確認待ちConstruction and commissioning progress, product scope and operating status pending company confirmation.
企業確認待ちManagement systems, product testing, customer validation and IP should be shown separately. Until formal documents are available, none is presented as an established fact.
System certification, applicability and certificate status to be supplied by the company.
証明書提出待ちMaterial and article reports are confirmed by market and product scope.
試験報告書待ちGranted, pending or technical achievement lists await company verification.
企業確認待ち証明書なしにバッジなし · 出典なしに数値なし
Material data, process boundaries and deliverable documents will be updated one item at a time as company verification is completed.